Take materials to projects with your phone

Published by Lagerdrift
Choose «Save as PDF» in the print dialog.

Printed from the Lagerdrift guides. Latest version of this guide: https://www.lagerdrift.no/en/guide/take-materials-to-a-project

This guide shows how users take materials out of stock with their phone: tap one button, scan the label, choose the amount and the project, and tap Remove stock. After that we show how to link the withdrawal to a project, and what the admin sets up once to make it work.

Note that this guide shows a setup for users who only take out and move materials. Every other function has been removed to keep it as simple as possible for this kind of user. As admin you can easily adjust what each user can do and see. Check our other guides or send us a request if you cannot find what you need.
For the user · day to day

Take materials out of stock

One button, one scan, amount and project, done. That is the whole routine when the material simply leaves the warehouse.

1

Tap the Material · Remove stock button

The home screen of the mobile app with the buttons Material Post to project, Material Add stock and Material Remove stock
The blue buttons are material functions the user has chosen as favourites, or that the admin has set up. See how to change favourites further down, or the guide to setting up favourites.
2

Scan the QR code on the label

A label with a QR code, the storage location E 1.2 and the material name
The label sits on the shelf or the box. The barcode on the product works too, if it has been added to the material.
3

Choose the amount and the project, tap Remove stock, done

The withdrawal screen with storage location, amount, project, stock change note and the Remove stock button
The app confirms with «Stock changed.» and the new stock at the location.

Project and note on the withdrawal

Two fields make the withdrawal far more useful afterwards:

The list for choosing a project with a search field and the Clear and New buttons
Tap Select Project, search or scroll, and tap the project.
The withdrawal screen with a project chosen and a stock change note
The project and the note follow the withdrawal into the history.
Same project all day? Switch on Remember Stock Change Project under Local Settings in the app, and the project is already chosen next time. Remember Stock Change Note does the same for the note. Both apply only to the phone where you switch them on.

Transfer to the project, or take it out?

There are two ways to send materials to a project. The difference is whether the material should still count as stock.

Remove stock

The material is used. The stock goes down at once, and the withdrawal is recorded on the project if you chose one. Nothing is left as stock on the project.

Use it when the material is installed or used up, for example cable lugs for a job.

Transfer to Project

The material is at the project. It moves to the project's own storage location and still counts as stock there. A project is mandatory.

Use it when the material will sit in the site container or on site for a while before it is used.

  1. Tap Material · Post to project and scan the label.
  2. Choose the amount and the project, add a note if you like, and tap Transfer to Project.
    The Transfer to Project screen with amount, chosen project, note and the blue Transfer to Project button
    The button is blue here. A project must be chosen before it can be tapped.

What sits on the project can later be taken out with Remove stock as usual: the project's location then shows in the list of storage locations. Whatever was not used goes back to the warehouse with Post back from Project.

Several materials at once

If you are taking a lot to the same project, use Combined Withdrawal instead: scan the materials one after the other into a list, set the amount on each, choose the project once, and tap Post. With Scan Continuously on, the scanner opens again after each material. Once a project is chosen, the Transfer to Project switch appears, and then the whole list is transferred instead of taken out.

The Favorites home screen in the mobile app with the favourite buttons Combined Withdrawal, Combined Addition and Combined transfer below the material buttons
The favourite button Combined Withdrawal, next to Combined Addition and Combined transfer.

Everything below is one-time setup for the admin; users never see any of it.

For the admin · one-time setup

Create the user

Web app: User Administration → Add User. Under Select Role(s), Fitter / Technician is a good starting point: the user gets the mobile app only and just enough access. The role only fills in permissions and settings for you; everything can be adjusted afterwards.

The Add User dialog with the role choice
Add the user and choose a role.

With many users, set up the first one correctly and copy to the rest: copy user permissions to several users at once.

The permissions needed for material withdrawals

Open the user and the Permissions tab. Two things need checking:

  1. Which storage locations the user can take from. Normally nothing should be ticked here. The user can then take from every storage location the material is in, which is what most companies need. If you want to restrict it, there are two boxes: Prevent Stock Change from Main Location stops withdrawals from the material's main storage location, and Only allow Stock changes for locations with own Name only lets the user take from a storage location with the same name as the user, for example their own service van. The Fitter / Technician role ticks both. If the user should take from the warehouse where the materials normally are, untick both boxes.
    The Permissions tab with the boxes Prevent Stock Change from Main Location and Only allow Stock changes for locations with own Name ticked
    Without ticks: the user can take from every storage location the material is in.
  2. Permission Groups at the bottom of the same tab. Material must be on Move to take materials out. Project on Read is enough to choose a project. If the user should also use Transfer to Project and Post back from Project, Project must be on Move. For a user with the Fitter / Technician role, Only allow Stock changes for locations with own Name (above) and Hide "Transfer" in Quick Functions (the Mobile Settings tab) must also be unticked, otherwise the Transfer to Project button does not show.
    Permission Groups with the levels Read, Consign, Move, Edit, Create and Delete per area
    Higher levels include the lower ones.

Choose the favourite buttons

Same dialog, the Favorites tab: choose Remove stock, and Post to project and Post back from Project too if you use them. The choice is locked with Disable Favorite Select if not Admin in the Mobile Settings tab. With the Fitter / Technician role that box is already ticked, and Remove stock is already among the favourites. Screenshots of both tabs are in the tool checkout guide; it works the same way for materials.

Recommended minimal setup: only Material · Remove stock. Add more buttons when the need comes up.

Create the projects

Web app: Master Data → Projects, tap + (Add Project). Only Name is mandatory. Optional: Customer, Project Date, Project End, Project Manager, Cost Center and delivery address.

Naming tip: start with the project number, for example «2026-052 New build Solbakken». The list then sorts itself, and users find the project quickly with the search.

If you would rather scan the project than look for it in the list, select the projects in the list and tap Print Labels. With the QR code on the wall of the site container, the project is chosen with one scan.

Project and note: mandatory or optional

See what has been taken out

Every withdrawal and transfer ends up in the web app under History → Stockchange History, with the columns User, Project, Note and Stock Change Type. Filter on the project and you see everything that went there.

No materials or labels in the system yet? Start with Getting started with Lagerdrift and QR codes for materials. Not sure whether something is a material or a tool? See Tools or materials.

Frequently asked questions

What is the difference between Remove stock and Transfer to Project?

Remove stock takes the material off the stock at once and records the withdrawal on the project if you chose one. Transfer to Project puts the material on the project's own storage location, where it still counts as stock until it is taken out or brought back with Post back from Project.

Does the user have to choose a project?

For Remove stock the admin decides per user with Project is a mandatory field for stock changes. The Fitter / Technician role ticks it, so there the project is mandatory until the box is unticked. For Transfer to Project a project is always mandatory.

Why can the user not take from the main warehouse?

The Fitter / Technician role ticks Prevent Stock Change from Main Location and Only allow Stock changes for locations with own Name. The user can then only take from storage locations with their own name. Untick both boxes under Permissions if the user should take from the warehouse where the materials normally are.

Where do I see what has been taken out for a project?

In the web app under History and Stockchange History, with the columns User, Project, Note and Stock Change Type.

Was this guide helpful?
← Back to the guides